Quick answer
Demolition, site clearance, setting out and construction can be one project. Cydro cleared a house in Horana in three days (17 to 20 January 2026) and another in Moratuwa (3 to 6 January 2026) before rebuilding.
Sometimes an old house is not worth renovating: the structure is poor, the layout no longer suits the family, or the plot would support a larger or more modern building. Demolishing and rebuilding can be simpler and cheaper than it sounds, if one team plans the whole sequence.
Two real examples from 2026
In Horana, we demolished a single-storey house and cleared the plot in three days, between 17 and 20 January 2026. In Moratuwa, an old house on Galle Road was cleared for a new three-storey apartment building between 3 and 6 January 2026. In both cases the same company then surveyed, set out and built the new structure.
The process, step by step
- Site visit and survey. We check access, neighbouring buildings, services and the condition of the structure.
- Plans and approvals. Your new design is prepared and submitted to the relevant local authority before building starts. Always confirm requirements with your local council.
- Disconnect services. Electricity, water and telephone lines are safely disconnected.
- Demolition. A machine such as an excavator brings the building down in a controlled way, with tipper trucks removing debris. Salvageable timber, roof sheets and doors can be set aside for reuse.
- Site clearance. The plot is levelled and cleared so the surveyor can see the real ground.
- Setting out. Our surveyors mark the new building lines with a total station or level, using pegs, string and lime.
- Ceremonies if you wish. Many families hold a blessing and first-cut ceremony before excavation begins.
- Foundations and construction begin.
Tips for a smooth rebuild
- Plan where you will live during construction, and for how long.
- Tell neighbours before demolition day. Dust control and quiet hours matter.
- Ask for demolition and construction to be priced together so there are no gaps or disputes between contractors.
- Check the boundary walls: they are often shared with neighbours and may need protecting or rebuilding.
Talk to an engineer
Free advice and a written quotation for your project.
Request a quoteWhatsApp usRelated