Quick answer

There is no single price: cost depends on size, site, structure, roof and finishes. As a real reference, Cydro built a 1,600 sq ft single-storey house in Delgoda for LKR 7.5 million. Ask for an itemised bill of quantities before you commit.

“How much will my house cost?” is the first question every client asks us, and the honest answer is: it depends on the design, the site and the specification. A price per square foot quoted over the phone is only a rough guide. What you can do is understand what drives the number, and ask for a proper bill of quantities (BOQ) before you commit.

A real example: 1,600 sq ft in Delgoda for LKR 7.5 million

One of our recent single-storey houses in Delgoda is 1,600 sq ft with three bedrooms, living and dining areas, a kitchen, a front verandah, an attached carport and a flat roof slab with an external staircase for a roof terrace. The project value agreed with the client was LKR 7.5 million for design and construction. It is a useful reference point, but only for that design and specification: rubble foundations, cement-block walls, a treated timber roof with colour-coated metal sheets, and a mid-range finish.

Our two-storey house with a basement in Hanwella was agreed at LKR 6 million. It is a smaller footprint on a steeply sloping site, which shows how much the plot and the design matter.

What drives the cost of a house

  • Size and number of floors: a compact two-storey plan is usually cheaper per square foot than a sprawling single-storey one, because the foundations and roof are shared.
  • The site: slope, soil, access for lorries and the need for retaining walls or filling all change the foundation and earthworks cost.
  • Structure: a full reinforced-concrete frame costs more than load-bearing walls, but is needed for multi-storey buildings and future extensions.
  • Roof: a simple pitched roof is cheaper than a complex multi-level roof, and a flat slab with a roof terrace adds cost but also usable space.
  • Windows, doors and joinery: solid teak and large glazed screens can easily become one of the biggest line items.
  • Finishes and services: floor tiles, kitchen cabinets, bathrooms, lighting, electrical and plumbing points, and air-conditioning provisions.

How to get an accurate estimate

  1. Start with drawings. Even a concept plan lets a quantity surveyor measure the work.
  2. Ask for a bill of quantities, not a single lump-sum figure. A BOQ lists every item, so you can compare quotes fairly and see where savings are possible.
  3. Agree the specification: tile grade, window type, roofing material and sanitary ware. Vague specifications lead to variation claims later.
  4. Set aside a contingency of around 5–10% for the unexpected, especially on sloping or unknown sites.
  5. Ask how payments are staged against progress, and how variations will be priced and approved in writing.

Tip

The cheapest quote is rarely the lowest final cost. Compare quotes line by line, and check what is excluded: boundary walls, landscaping, septic tank, wiring and light fittings are often left out.

Where you can save without hurting quality

Keep the plan simple and rectangular, limit long cantilevers, choose standard window sizes, and spend on what is hard to change later (structure, waterproofing, electrical and plumbing) rather than on finishes you can upgrade over time. Building in phases is another option, see our guide to phased house construction.

Planning a house? Send us your plot location and a rough idea of what you want, and our quantity surveyors will prepare an itemised estimate.

Talk to an engineer

Free advice and a written quotation for your project.

Request a quoteWhatsApp us

Related

FAQ

Frequently asked questions

How much does it cost to build a 1,600 sq ft house in Sri Lanka?

It depends on the design and specification. Our reference project, a 1,600 sq ft single-storey house with a roof terrace in Delgoda, was agreed at LKR 7.5 million for design and construction. Get a bill of quantities for your own plan for an accurate figure.

What is a bill of quantities (BOQ)?

A BOQ is an itemised list of all the materials and work in a building, with quantities and rates. It lets you compare contractors quotes fairly and control costs.

How much contingency should I allow?

We suggest around 5 to 10 percent for unexpected costs, more on sloping or unknown sites.