
Three-Storey Apartment Building, Galle Road, Moratuwa
An old house cleared in three days to make way for a new three-storey apartment building on Galle Road, Moratuwa.
Clearing the way
The site on Galle Road, Moratuwa held an old single-storey house. Our team demolished it and cleared the plot with a backhoe loader between 3 and 6 January 2026.
Building up
After the blessing and foundation stone ceremony, we set out the building with a total station and built a reinforced-concrete frame with cast-in-situ staircases, cement-block and burnt-clay brick walls and suspended slabs for each floor.
Where we are now
The structure is up and the project is in the plastering phase, with chicken-wire mesh at every concrete-to-masonry joint to prevent cracking, and timber window frames with louvred fanlights fitted.
Project highlights
Demolition and site clearance in 3 days
Multi-storey RC frame on a tight urban plot
Crack-control mesh at concrete–masonry joints
Now in the plastering phase
Project facts
Location
Moratuwa, Colombo District
Sector
Residential
Delivery
Demolition, Design & Build
Status
In progress
Building
Three-storey apartment building
Demolition
3–6 January 2026
Stage
Plastering
Services used
Get a quote for a similar projectWhatsApp us about this projectRelated projects
Planning something similar in Moratuwa?
Tell us about your plot and your plans. We'll visit, advise and send a clear written quotation.











